Solar Projects

Our team specializes in Solar Projects. We are skilled Solar Installation Technicians contributing to the installation of cutting-edge solar power systems, ensuring high-quality execution and operational excellence.

Key Responsibilities:

  • Helicoil Installation: Precisely install helicoils to secure structural components, ensuring durability and stability in solar array foundations.

  • Welding Beam Setup: Set and weld support beams with accuracy, adhering to engineering specifications to create robust frameworks for solar panel mounts.

  • Solar Power System Installation: Assemble, mount, and connect solar panels, inverters, and related electrical components to build fully operational solar power systems for Tesla’s energy infrastructure and Lake Elsinore’s renewable energy goals.

  • Quality Assurance: Conduct inspections and testing to verify system performance, alignment, and compliance with safety and industry standards.

  • Collaboration: Work closely with engineers, electricians, and project managers to maintain project timelines and deliver exceptional results in a fast-paced environment.

  • Safety Compliance: Adhere to OSHA regulations and company safety protocols to maintain a secure work environment during all installation activities.

Project Highlights:

  • Successfully installed advanced solar power systems in the Mojave Desert to support Tesla’s clean energy initiatives, contributing to the company’s mission of accelerating the world’s transition to sustainable energy.

  • Delivered reliable, high-efficiency solar arrays for Lake Elsinore, enhancing local access to renewable energy and reducing carbon footprints.

  • Provided installation of a solar grid in Beaumont, CA

  • Utilized state-of-the-art equipment and techniques to install thousands of solar panels in Rosamond, CA ensuring optimal energy capture and long-term system performance.

Mojave Solar Project

Aided in the solar efforts in the Mojave Solar Project, a 250-megawatt concentrating solar power (CSP) facility near Harper Dry Lake in San Bernardino County

Rosamond Solar Project

MBCC is pictured here installing helicoils & setting welding beams. Rosamond solar farm contains 54 megawatts of clean, renewable solar power located near Edwards Air Force Base in Kern County, CA.

Beaumont Solar Project

Beaumont BESS is a battery storage project located in Riverside, California. It has a total capacity of 116.6 MW. It was built in July 2024 and is operated by Terra-Gen Operating Co-BESS 2.

Previous
Previous

Sun Valley Watershed

Next
Next

Emergency Jobs